The Future Is Not Artificial
Present
Research architecture

Every claim,
with its receipts.

Every factual claim on this website has an ID, a value, a unit, a metric type, a provenance status, a source, an access date and a caveat. Nothing is displayed anywhere on this site that is not in this table.

30 claims · sources last read 2026-08-16 · 1 still need human re-verification

Re-verify before presenting

These figures came from the project brief and were not independently re-read from their source when the site was built. Everything else in the table below was.

30 shown
Regulator verified Unspecified metric

Proposed large-load projects seeking grid connection

A connection request is not a built project. Requests can be withdrawn, resized, duplicated or refused.

Alberta Electric System Operator ↗ System operator accessed 2026-08-16

aeso-projects-count

Regulator verified Grid allocation

Total capacity sought by those connection requests

This is requested grid connection capacity as of June 2025, not electricity that will be consumed. It is the size of the queue, not the size of the future.

Alberta Electric System Operator ↗ System operator accessed 2026-08-16

aeso-gw-seeking

Regulator verified Grid allocation

AESO interim Phase 1 large-load connection limit

An interim total allocated across Phase 1 while longer-term arrangements are developed — not a limit per project.

Alberta Electric System Operator ↗ System operator accessed 2026-08-16

aeso-interim-limit

Regulator verified Data-centre load

AESO illustrative comparison: load of the City of Edmonton

AESO offers this as a size comparison only. It does not mean any single project "uses more power than Edmonton" — compare the bars, and read what each bar measures.

Alberta Electric System Operator ↗ System operator accessed 2026-08-16

aeso-edmonton-illustrative

Company announced Headline facility scale

Announced facility scale

Meta Sturgeon Data Centre

A headline "1 gigawatt facility" describes the scale the campus is designed toward. It is not a measured load, and it is not the same as the grid allocation below.

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

meta-headline-gw

Government reported

Announced investment

Meta Sturgeon Data Centre

Listed by Alberta Major Projects as $13.0B for the data centre. The adjacent Greenlight power plant is a separate project with a separate budget — do not add them together and call the total "Meta’s investment".

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

meta-investment

Company announced

Campus land area

Meta Sturgeon Data Centre

This is the land the campus sits on, in Alberta’s Industrial Heartland. It is NOT the size of the buildings.

Meta ↗ Company disclosure accessed 2026-08-16

meta-land-acres

Calculated on this site

Campus land area, converted

Meta Sturgeon Data Centre

1,750 acres × 4,046.86 m²/acre = 7,082,005 m² ≈ 7.08 km² ≈ 708 hectares.

Unit conversion of the announced acreage. Campus land, not building footprint.

This website Technical reference accessed 2026-08-16

meta-land-km2

Company announced

Facility floor space

Meta Sturgeon Data Centre

Meta describes this as its largest data centre outside the United States. This is floor space inside buildings — roughly 4% of the campus land area.

Meta ↗ Company disclosure accessed 2026-08-16

meta-building-ft2

Calculated on this site

Facility floor space, converted

Meta Sturgeon Data Centre

2,900,000 ft² × 0.092903 m²/ft² = 269,419 m² ≈ 269,000 m².

This website Technical reference accessed 2026-08-16

meta-building-m2

Government reported Grid allocation

Phase 1 grid allocation

Meta Sturgeon Data Centre

A grid allocation is permission to draw up to this much from the Alberta grid. It is not a generator, and it is not a measurement of what the site will actually consume.

Global News / The Canadian Press ↗ Journalism accessed 2026-08-16

meta-grid-allocation

Company announced Generation capacity

Greenlight Electricity Centre generating capacity

Meta Sturgeon Data Centre

This is a SEPARATE adjacent natural-gas project (Pembina / Kineticor), reported at ~$4.6B and expected in service in the second half of 2030 — after the data centre is running. Generation capacity is what a plant can produce; it is not the data centre’s load.

Global News / The Canadian Press ↗ Journalism accessed 2026-08-16

greenlight-generation

Company announced Generation capacity

Capital Power long-term supply agreement

Meta Sturgeon Data Centre

A contract for electricity available in the second half of 2028. A supply agreement is a commercial arrangement, not a fourth power plant to be added to the others.

Global News / The Canadian Press ↗ Journalism accessed 2026-08-16

capital-power-agreement

Government reported Headline facility scale Re-verify

Possible full campus build-out figure

Meta Sturgeon Data Centre

A possible eventual campus scale, well beyond the announced first phase. Treat as an upper bound under discussion, not a commitment.

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

meta-full-buildout

Government reported

Peak construction workforce

Meta Sturgeon Data Centre

Peak, not sustained. Construction employment ends when construction ends.

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

meta-construction-jobs

Government reported

Permanent operational jobs

Meta Sturgeon Data Centre

Large data centres are capital-intensive rather than labour-intensive: billions of dollars, hundreds of permanent staff.

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

meta-permanent-jobs

Applicant proposed Generation capacity

Proposed total generating capability

Beacon AI Centers — Indus Project

“The total capability of the project would be 1,494 megawatts.” This is generation capability applied for — it is NOT the data-hall load, and the application is still under consideration.

Alberta Utilities Commission ↗ Regulator accessed 2026-08-17

beacon-indus-total

Applicant proposed Data-centre load

Supply to co-located data halls, normal operation

Beacon AI Centers — Indus Project

Under normal operating scenarios approximately 1,200 MW would supply co-located, on-site AI/HPC data halls. The other ~294 MW is not data-hall supply.

Alberta Utilities Commission ↗ Regulator accessed 2026-08-17

beacon-indus-datahall

Regulator verified

AUC oral hearing commences

Beacon AI Centers — Indus Project

Proceeding 30524. Virtual hearing scheduled to commence 9:00 a.m. Re-checked 17 August 2026 and the schedule was unchanged. Hearing dates still move — re-check the AUC page on the morning of the talk.

Alberta Utilities Commission ↗ Regulator accessed 2026-08-17

beacon-indus-hearing

Applicant proposed Generation capacity

Proposed combined-cycle natural-gas capacity

Synapse Data Center Power Plant

Proposed generation to power the on-site data-centre load.

Alberta Utilities Commission ↗ Regulator accessed 2026-08-16

synapse-generation

Applicant proposed Backup generation

Proposed emergency / backup diesel generation

Synapse Data Center Power Plant

Backup capacity exists to survive an outage. It is not intended to run continuously, and it must never be added to the generation figure as though the site produced 3,200 MW.

Alberta Utilities Commission ↗ Regulator accessed 2026-08-16

synapse-backup

Regulator verified

Connection to the Alberta Interconnected Electric System

Synapse Data Center Power Plant

“The power plant will not be connected to the Alberta Interconnection Electric System but will be used to power the on-site data centre load.” This is the behind-the-meter model.

Alberta Utilities Commission ↗ Regulator accessed 2026-08-16

synapse-not-connected

Regulator verified

Proceeding status

Synapse Data Center Power Plant

As of 16 June 2026 the AUC suspended current process steps while preparing additional information requests. No full hearing schedule has been determined.

Alberta Utilities Commission ↗ Regulator accessed 2026-08-16

synapse-status

Government reported Generation capacity

Proposed total capability

Beacon Heartland AI Hub

Proposed; approvals still being sought. Listed completion by 2027.

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

beacon-heartland-mwe

Government reported Data-centre load

Phase 1 combined capacity across four facilities

Technologies New Energy / Data District — Phase 1

Combined across four separate sites (Olds, Bonnyville, Calgary, Edmonton) — not a single 240 MW facility.

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

tne-capacity

Government reported

Phase 1 combined development budget

Technologies New Energy / Data District — Phase 1

Combined budget across all four Phase 1 facilities.

Government of Alberta — Major Projects ↗ Provincial government accessed 2026-08-16

tne-investment

Company announced Data-centre load

Illustrative modern AI rack power

NVIDIA GB300 NVL72 reference configuration, used here ONLY to show what a dense modern AI rack looks like. No Alberta project has publicly confirmed this hardware. Rack counts and chip counts for Alberta projects are not publicly disclosed.

NVIDIA ↗ Technical reference accessed 2026-08-16

nvl72-rack-power

Calculated on this site

Area of one standard football pitch

105 m × 68 m = 7,140 m² (standard pitch dimensions).

This website Technical reference accessed 2026-08-16

pitch-area

Calculated on this site

Meta campus land, in football pitches

Meta Sturgeon Data Centre

7,082,005 m² ÷ 7,140 m² = 991.9 ≈ 992 pitch areas.

Land area of the whole campus — roads, buffers, substations and empty ground included.

This website Technical reference accessed 2026-08-16

meta-pitches-land

Calculated on this site

Meta facility floor space, in football pitches

Meta Sturgeon Data Centre

269,419 m² ÷ 7,140 m² = 37.7 ≈ 38 pitch areas.

The building floor space is about one twenty-sixth of the campus land. Confusing these two numbers is the single most common data-centre reporting error.

This website Technical reference accessed 2026-08-16

meta-pitches-floor