Meta Sturgeon Data Centre
Alberta’s Industrial Heartland, ~35 km northeast of Edmonton · Sturgeon County
Meta’s first data centre in Canada and its largest outside the United States. Ground was broken in July 2026. It is the deep-dive case study on this site because its land, investment, cooling design and power arrangements are unusually well documented — not because it is the biggest or the most typical.
- Announced scale
- Data-centre load
- Not publicly disclosed
- Generation capacity
- Grid allocation
- Backup generation
- Not publicly disclosed
- Land
- Building area
- Investment
- Cooling
- Closed-loop, direct liquid cooling with dry heat rejection
- Water
- Company states no operational water use for cooling; site water limited to domestic use, fire protection and equipment maintenance
- Construction jobs
- Permanent jobs
- Regulatory status
- Under construction; adjacent Greenlight generation is a separate project and process
Who is saying what
Meta describes a closed-loop, liquid-cooled design with dry cooling requiring no operational water use for cooling, and has said annual site water use would be less than a typical Alberta golf course.
Alberta Major Projects lists the project at $13.0B, 1 gigawatt, 3,000+ peak construction workers and 300 permanent jobs, and describes it as powered by a natural gas power plant.
The data centre itself is not an AUC generation proceeding. The adjacent Greenlight Electricity Centre is a separate project with its own approvals.
Sturgeon County has publicly welcomed the investment. Broader debate in Alberta concerns grid access, gas-fired generation and how large loads share transmission costs.
Chip model, chip count, rack count, PUE, operational WUE, annual electricity consumption, annual emissions and final site layout are all NOT publicly disclosed.